The demo household · Board
A board: repairing a bridge
Marcus runs the Elm Street bridge repair for the city. The board holds the jobs and when each one is due.
A read-only tour. The family is made up; the screens are the app's.
Elm Street bridge
13 cardsDeck and joint repairs on the east span. Both lanes open by spring.
Ideas5
Patch pier 2, or wrap it?
A patch holds for five years. A carbon wrap costs twice as much and means one more closure, but it lasts twenty.
LowAsk Parks about the trail under the bridge
- Contractors
Rewire the deck lighting
The contractor's job, once the quote is agreed.
Fri, Nov 27 - Site visit
Repaint the railings
LowWed, Dec 2M Book the diver for the pier inspection
This week4
- Materials
Finish the bridge report
Due to the city engineer by five today. What we found, the photos, and what the joint repair will cost.
HighToday2/3M - Contractors
Get a quote for the deck lighting
Twelve poles on the walkway side, and the two at the east ramp that keep going out.
Urgent2 days lateM - Site visit
Walk the deck with the contractor on Saturday
TomorrowM - MaterialsSite visit
Replace the expansion joints
North lane first, then the south lane once the report is signed off.
HighMon, Nov 23M
Doing2
- Materials
Draw the lane closure plan
Close the north lane first, keep the walkway open the whole time.
Mon, Nov 16M File the site photos by date
Low
Done2
Run the load test
DoneCheck whether the closure needs a state permit
It does not, as long as one lane stays open to traffic.
Done