The demo household · Note
A note, and the note it links to
Notes hold the thinking behind the board. This one links to another, which sits underneath it.
A read-only tour. The family is made up; the screens are the app's.
The demo household · Note
Notes hold the thinking behind the board. This one links to another, which sits underneath it.
A read-only tour. The family is made up; the screens are the app's.
The east span has been down to one lane since the spring inspection. The expansion joints are letting water through to the bearings, and the deck lighting on the walkway side is mostly dark. The school buses use this bridge, so both lanes have to be open again before next fall.
The city set aside 1.2 million for the whole job. The joints are about 640,000, the lighting quote should come in near 90,000, and the rest is the pier, the paint and the traffic control.
The closure sketch is on the whiteboard. The board has the jobs.
From Tuesday's walk of the east span with the contractor and one very patient inspector.
Both joints on the north lane are cracked through the seal. Water runs straight onto the bearings below, which is where the rust started.
Spalling on the upstream face, about two feet across. Nothing structural yet, but the diver needs to look below the waterline before we pick a patch or a wrap.
Three of the deck drains are blocked with leaves. Clearing them is a morning's work and buys the joints some time.
Seven of the twelve walkway lights are out. The wiring is original, so a new run is cheaper than chasing faults. Still need the quote.